01 NCAC 41B .0508          PRE-AWARD REPORTS

Before the award of a guaranteed energy savings contract, the qualified provider shall provide a report, as part of its proposal, which shall be available for public inspection, summarizing estimates of all costs of installation, maintenance, repairs and debt service and estimates of the amounts by which energy or operating costs will be reduced.

 

History Note:        Authority G.S. 143-64.17F;